News

The railroad bridge, weighing in at approximately 700 tons, was installed by the Rosslauer Schiffswerft on 01 December 2018. The highway BAB 8 had to be fully blocked off for parts of the work. The local newspaper Pforzheimer Zeitung documented the procedure in a video.

Read more

Cleaning and conserving the 60 year old historical vessel FMS “GERA” was completed by Rupertus Strako last week.

Read more

A documentary with the title “It's a long way to the ocean – Building Ships in Roßlau (Der weite Weg zum Meer – Schiffbau in Roßlau)” including a segment about the Rosslauer Schiffswerft was aired by MDR yesterday. The movie was made by Lutz Hofmann.

Read more

The second bridge constructed by the Roßlauer Schiffswerft for crossing the highway BAB 3 was – in the course of modernization works at the highway-crossing Fürth/Erlangen – successfully installed last weekend.

Read more

Following the motto “Building the Future“, on the last weekend of September the 2018 Heinrich Rönner Manager Meeting took place in Wolfsburg.

Read more

Due to changed customer behavior, ATIS Arbeitsschutz, Technik und Industriebedarf GmbH will adjust its opening hours from 01 October 2018.

Read more

The floating crane BHV ATHLET was not just given a new coat of paint during its drydocking in August 2018.

Read more

The Bremerhavener Heinrich Rönner Group is thoroughly pleased with the results of its participation in the industry leading exhibition SMM.

Read more

The Kennedybrücke in Bremerhaven, erected in 1960 and 1961, has, in the course of time, been damaged by the salty air in a way that made extensive maintenance work necessary.

Read more
[Translate to Englisch:] Macor-Mitarbeiter nach der erfolgreichen Beendigung des Firmenlaufes B2Run Bremen 2018 mit dem obligatorischen, alkoholfreiem, isotonischem Einlaufbier.

The B2Run company run took place in Bremen on 29 May 2018.

Read more