The CAP SAN DIEGO, commissioned in 1962, spent almost four weeks in Dock V of Bredo Dry Docks GmbH for class work. Over 200 points were processed. In addition to work on the engine, the stern tube and on deck, the tanks and the chain case were cleaned, measured and preserved. In addition, the entire outer skin of the ship was repainted.
![[Translate to Englisch:] Hamburger CAP SAN DIEGO durch Rupertus-Strako GmbH mit 2.200 Litern rot-weißer Farbe neu gestrichen](/fileadmin/user_upload/01_RS_Cap_San_Diego.jpg)